Progress Report
- Design plans for Royal Bay Secondary are being reviewed next week. These show the design of the school – everything from heating, plumbing, electrical, and air movement, to the inside and outside design of the school.
- Slab on grade pour phase 1 is complete, the second pour is happening this week.
- The walls of Royal Bay Secondary are being built offsite.
- The structural steel work will commence in the first week of February.
- Staff continue to meet with the builder on site every two weeks to discuss progress.
Take the virtual tour of Royal Bay Secondary – Opening 2015!